Each year, surface material needs to be replenished on clay courts. Throughout the year, surface material is lost due to rain and wind. Although HydroCourts, courts with underground irrigation systems, tend to lose less surface material than an aboveground irrigated court, some loss is inevitable. Approximately every two years the lines will need to be replaced due to wear. If your courts are due for a resurfacing, contact us today!
STEP 1: Remove dead material
STEP 2: Scarify existing surface
STEP 3: Ladder the new material
STEP 4: Dress the edges
STEP 5: Water the courts
STEP 6: Groom the surface material
STEP 7: Compact the surface material
STEP 8: Lay out the playing lines
STEP 9: Nail and secure the playing lines
STEP 10: Play!
Whether it’s new construction, resurfacing existing courts, or ordering from our accessories catalog, let us know how we can help.
1272 Boltons Branch Dr.
Mobile, AL 36606
P: 251-476-4714